Border geo-coordinates: 50.758821, 5.703059 [Open on OpenStreetMap, OpenRailwayMap]
Status: Operational
#CrossBorderRail assessment: Active passenger line - visited by 🚆
Date(s) visited during #CrossBorderRail project: 22/11/2022
Core Data
Track gauge: 1435 mm
[Check this on OpenRailwayMap]
Max speed: 120km/h
[Check this on OpenRailwayMap]
Number of tracks: 2
[Check this on OpenRailwayMap]
Electrification: [BE]: 3 kV=; [NL]: 1.5 kV=
[Check this on OpenRailwayMap]
Train control system: [BE]: Crocodile, [NL]: ATB
[Check this on OpenRailwayMap]
European Commission Political Assessment
Importance to border region: High
Importance to countries concerned: Medium
Importance to TEN-T network: Low
TEN-T corridor: Comprehensive Network
European Commission Administrative Data
Infrastructure manager: Infrabel [BE]; ProRail [NL]
Language of operation: French/Dutch
Competent authorities for PSO passenger services: FOD Mobiliteit en Vervoer [BE]; Provincie Limburg [NL]
Railway undertaking(s): SNCB [BE]; NS [NL]
Ministry of transport: FOD Mobiliteit en Vervoer [BE]; Ministerie van Infrastructuur en Milieu [NL]
European Commission Historical Data
Inauguration: 1861
Closure: -
Passenger services: 241 / 0 / 0 / -
Length of cross border section: 2,1 km
Average speed of cross border section: 42 km/h
Daily passenger flow: Not available