Border geo-coordinates: 40.605841, -6.826161 [Open on OpenStreetMap, OpenRailwayMap]

Status: Operational

#CrossBorderRail assessment: Active line, no passenger service - visited by 🚲

Date(s) visited during #CrossBorderRail project: 27/10/2023

Core Data

Track gauge: 1668 mm
[Check this on OpenRailwayMap]

Max speed: 60km/h
[Check this on OpenRailwayMap]

Number of tracks: 1
[Check this on OpenRailwayMap]

Electrification: -
[Check this on OpenRailwayMap]

Train control system: [PT]: EBICAB/CONVEL [ES]: ASFA, LZB, EBICAB, SELCAB
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region: Low

Importance to countries concerned: Medium

Importance to TEN-T network: Medium

TEN-T corridor: Atlantic

European Commission Administrative Data

Infrastructure manager: Refer [PT]; ADIF [ES]

Language of operation: ?

Competent authorities for PSO passenger services: Ministro do Planeamento e Infraestruturas [PT]; Ministerio de Fomento [ES]

Railway undertaking(s): CP — Comboios de Portugal [PT]; Renfe Operadora [ES]

Ministry of transport: Ministro do Planeamento e Infraestruturas [PT]; Ministerio de Fomento [ES]

European Commission Historical Data

Inauguration: 1882

Closure: -

Passenger services: 0 / 7 / 7 / -

Length of cross border section: 1 km

Average speed of cross border section: 15 km/h

Daily passenger flow: Not available

Background