Border geo-coordinates: 46.713607, 6.347783 [Open on OpenStreetMap, OpenRailwayMap]
Status: Operational
#CrossBorderRail assessment: Active passenger line - visited by 🚆
Date(s) visited during #CrossBorderRail project: 01/07/2024
Core Data
Track gauge: 1435 mm
[Check this on OpenRailwayMap]
Max speed: 120km/h
[Check this on OpenRailwayMap]
Number of tracks: 1
[Check this on OpenRailwayMap]
Electrification: 25 kV/50 Hz~ as far as Vallorbe; CH: 15 kV/16.7 Hz~
[Check this on OpenRailwayMap]
Train control system: [CH]: ZUB/Signum/EuroSIGNUM/EuroZUB, from ca. 2018 EuroSIGNUM/EuroZUB; ETCS L1
[Check this on OpenRailwayMap]
European Commission Political Assessment
Importance to border region: Low
Importance to countries concerned: Medium
Importance to TEN-T network: Low
TEN-T corridor: Comprehensive Network
European Commission Administrative Data
Infrastructure manager: SBB [CH]; SNCF Réseau [FR]
Language of operation: French
Competent authorities for PSO passenger services: Canton de Vaud [CH]; Région Bourgogne-Franche-Comté [FR]
Railway undertaking(s): SBB [CH]; SNCF [FR]
Ministry of transport: UVEK [CH]; Ministère de la Transition écologique et solidaire [FR]
European Commission Historical Data
Inauguration: 1862
Closure: -
Passenger services: 10 / 58 / 14 / -
Length of cross border section: 11 km
Average speed of cross border section: 66 km/h
Daily passenger flow: Not available