Border geo-coordinates: 46.89911, 6.45883 [Open on OpenStreetMap, OpenRailwayMap]
Status: Operational
#CrossBorderRail assessment: Active passenger line - visited by 🚆
Date(s) visited during #CrossBorderRail project: 05/06/2023
Core Data
Track gauge: 1435 mm
[Check this on OpenRailwayMap]
Max speed: 80km/h
[Check this on OpenRailwayMap]
Number of tracks: 1
[Check this on OpenRailwayMap]
Electrification: 15 kV/16.7 Hz~ as far as Pontarlier, then 25 kV/50 Hz~
[Check this on OpenRailwayMap]
Train control system: ZUB/Signum/EuroSIGNUM/EuroZUB, From ca. 2017: EuroSIGNUM/EuroZUB; ETCS L1 LS),
[Check this on OpenRailwayMap]
European Commission Political Assessment
Importance to border region: Medium
Importance to countries concerned: No
Importance to TEN-T network: Low
TEN-T corridor: Comprehensive Network
European Commission Administrative Data
Infrastructure manager: SBB [CH]; SNCF Réseau [FR]
Language of operation: French
Competent authorities for PSO passenger services: République et Canton de Neuchâtel [CH]; Région Bourgogne-Franche-Comté [FR]
Railway undertaking(s): SBB [CH]; SNCF [FR]
Ministry of transport: UVEK [CH]; Ministère de la Transition écologique et solidaire [FR]
European Commission Historical Data
Inauguration: 1860
Closure: -
Passenger services: 42 / 0 / 0 / -
Length of cross border section: 30 km
Average speed of cross border section: 78 km/h
Daily passenger flow: Not available











