Border geo-coordinates: 47.262689, 16.479067 [Open on OpenStreetMap, OpenRailwayMap]

Status: Non-Operational Classification Entirely Missing: Dismantled

#CrossBorderRail assessment: Dismantled or disused line - visited by 🚲

Date(s) visited during #CrossBorderRail project: 03/08/2025

Core Data

Track gauge: 1435 mm
[Check this on OpenRailwayMap]

Max speed: -km/h
[Check this on OpenRailwayMap]

Number of tracks: -
[Check this on OpenRailwayMap]

Electrification: -
[Check this on OpenRailwayMap]

Train control system: -
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region: Medium

Importance to countries concerned: Low

Importance to TEN-T network: No

TEN-T corridor: -

European Commission Administrative Data

Infrastructure manager: -; -

Language of operation: -

Competent authorities for PSO passenger services:

Railway undertaking(s): -; -

Ministry of transport: BMVIT [AT]; National Transport Authority (NTA) [HU]

European Commission Historical Data

Inauguration: 1925

Closure: 1953

Passenger services:

Length of cross border section:

Average speed of cross border section:

Daily passenger flow:

Background

According to the study “AT-HU Transport infrastructure projects” the line (with a new track between Schachendorf and

Photos from Schachendorf 🇦🇹 – Torony 🇭🇺

There are no photos of this border on Flickr from the #CrossBorderRail project. Please see the main description above.