Border geo-coordinates: 46.17746, 5.990495 [Open on OpenStreetMap, OpenRailwayMap]
Status: Operational
#CrossBorderRail assessment: Active passenger line - visited by 🚆
Date(s) visited during #CrossBorderRail project: 11/10/2024
Core Data
Track gauge: 1435 mm
[Check this on OpenRailwayMap]
Max speed: 100km/h
[Check this on OpenRailwayMap]
Number of tracks: 2
[Check this on OpenRailwayMap]
Electrification: 25 kV/50 Hz~ as far as Genève; [CH]: 15 kV/16.7 Hz~, partially switchable track
[Check this on OpenRailwayMap]
Train control system: KVB; EuroSIGNUM/EuroZUB, ETCS L1 LS
[Check this on OpenRailwayMap]
European Commission Political Assessment
Importance to border region: High
Importance to countries concerned: Medium
Importance to TEN-T network: Low
TEN-T corridor: Comprehensive Network
European Commission Administrative Data
Infrastructure manager: SBB [CH]; SNCF Réseau [FR]
Language of operation: French
Competent authorities for PSO passenger services: République et Canton de Genève [CH]; Région Auvergne-Rhône-Alpes [FR]
Railway undertaking(s): SBB [CH]; SNCF [FR]
Ministry of transport: UVEK [CH]; Ministère de la Transition écologique et solidaire [FR]
European Commission Historical Data
Inauguration: 1859
Closure: -
Passenger services: 278 / 14 / 0 / -
Length of cross border section: 8 km
Average speed of cross border section: 80 km/h
Daily passenger flow: Not available

