Border geo-coordinates: 54.112057, -6.29226 [Open on OpenStreetMap, OpenRailwayMap]

Status: Non-Operational

#CrossBorderRail assessment: Dismantled or disused line - visited by 🚲

Date(s) visited during #CrossBorderRail project: 04/09/2023

Core Data

Track gauge: 1600 mm
[Check this on OpenRailwayMap]

Max speed: -km/h
[Check this on OpenRailwayMap]

Number of tracks: -
[Check this on OpenRailwayMap]

Electrification: -
[Check this on OpenRailwayMap]

Train control system: -
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region: Low

Importance to countries concerned: Low

Importance to TEN-T network: No

TEN-T corridor: -

European Commission Administrative Data

Infrastructure manager: -; -

Language of operation: -

Competent authorities for PSO passenger services: Department of Transport, Tourism and Sport [IE]; Department for Transport [UK]

Railway undertaking(s): -; -

Ministry of transport: Department of Transport, Tourism and Sport [IE]; Department for Transport [UK]

European Commission Historical Data

Inauguration: 1876

Closure: 1952

Passenger services:

Length of cross border section: 11 km

Average speed of cross border section: -

Daily passenger flow: -

Background

Photos from Omeath 🇮🇪 – Newry Bridge Street 🇬🇧

There are no photos of this border on Flickr from the #CrossBorderRail project. Please see the main description above.