Border geo-coordinates: 47.698985, 16.493963 [Open on OpenStreetMap, OpenRailwayMap]
Status: Operational Classification Exploited With Shortcomings Services
#CrossBorderRail assessment: Active passenger line - visited by 🚲
Date(s) visited during #CrossBorderRail project: 03/08/2025
Core Data
Track gauge: 1435 mm
[Check this on OpenRailwayMap]
Max speed: 120 km/hkm/h
[Check this on OpenRailwayMap]
Number of tracks: 1
[Check this on OpenRailwayMap]
Electrification: [AT]: 15kV 16.7Hz ~ (under construction); [HU]: not electrified
[Check this on OpenRailwayMap]
Train control system: PZB, EVM
[Check this on OpenRailwayMap]
European Commission Political Assessment
Importance to border region: High
Importance to countries concerned: Medium
Importance to TEN-T network: No
TEN-T corridor: Rhein-Donau-Korridor
European Commission Administrative Data
Infrastructure manager: GYSEV Raaberbahn [AT]; GYSEV Raaberbahn [HU]
Language of operation: ?
Competent authorities for PSO passenger services:
Railway undertaking(s): ÖBB, Raaberbahn [AT]; MÁV START, GySEV [HU]
Ministry of transport: BMVIT [AT]; National Transport Authority (NTA) [HU]
European Commission Historical Data
Inauguration: 1847
Closure: -
Passenger services:
Length of cross border section: 7,8 km
Average speed of cross border section:
Daily passenger flow: not available
Background
Detailled study “AT-HU Transport infrastructure projects” discusses this route.