Border geo-coordinates: 47.050277, 6.716918 [Open on OpenStreetMap, OpenRailwayMap]

Status: Operational

#CrossBorderRail assessment: Active passenger line - visited by 🚆

Date(s) visited during #CrossBorderRail project: 05/10/2022

Core Data

Track gauge: 1435 mm
[Check this on OpenRailwayMap]

Max speed: 40-60km/h
[Check this on OpenRailwayMap]

Number of tracks: 1
[Check this on OpenRailwayMap]

Electrification: -
[Check this on OpenRailwayMap]

Train control system: [CH]: ZUB/Signum/EuroSIGNUM/EuroZUB, from ca. 2018 EuroSIGNUM/EuroZUB; ETCS L1
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region: Medium

Importance to countries concerned: No

Importance to TEN-T network: No

TEN-T corridor: -

European Commission Administrative Data

Infrastructure manager: SBB [CH]; SNCF Réseau [FR]

Language of operation: French

Competent authorities for PSO passenger services: République et Canton de Neuchâtel [CH]; Région Bourgogne-Franche-Comté [FR]

Railway undertaking(s): SBB [CH]; SNCF [FR]

Ministry of transport: UVEK [CH]; Ministère de la Transition écologique et solidaire [FR]

European Commission Historical Data

Inauguration: 1884

Closure: -

Passenger services: 76 / 0 / 0 / -

Length of cross border section: 11 km

Average speed of cross border section: 47 km/h

Daily passenger flow: Not available

Background