Border geo-coordinates: 50.173066, 5.965304 [Open on OpenStreetMap, OpenRailwayMap]

Status: Operational

#CrossBorderRail assessment: Active passenger line - visited by 🚆

Date(s) visited during #CrossBorderRail project: 26/11/2024

Core Data

Track gauge: 1435 mm
[Check this on OpenRailwayMap]

Max speed: km/h
[Check this on OpenRailwayMap]

Number of tracks: 1
[Check this on OpenRailwayMap]

Electrification: 25kV/50Hz~; system change to typical Belgian 3kV= is just south of Rivage [BE]
[Check this on OpenRailwayMap]

Train control system: Crocodile, MEMOR 2+, ETCS-L1
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region: High

Importance to countries concerned: Medium

Importance to TEN-T network: Low

TEN-T corridor: Comprehensive Network

European Commission Administrative Data

Infrastructure manager: Infrabel [BE]; CFL [LU]

Language of operation: French/Luxembourgish

Competent authorities for PSO passenger services: FOD Mobiliteit en Vervoer [BE]; Département des Transports [LU]

Railway undertaking(s): SNCB [BE]; CFL [LU]

Ministry of transport: FOD Mobiliteit en vervoer [BE]; Ministère du Développement durable et des

European Commission Historical Data

Inauguration: 1867

Closure: -

Passenger services: 140 / 84 / 0 / -

Length of cross border section: 15 km

Average speed of cross border section: 82 km/h

Daily passenger flow: Not available

Background

Photos from Gouvy 🇧🇪 – Troisvierges 🇱🇺

There are no photos of this border on Flickr from the #CrossBorderRail project. Please see the main description above.