Border geo-coordinates: 49.79024, 18.599376 [Open on OpenStreetMap, OpenRailwayMap]

Status:

#CrossBorderRail assessment: razed track

Date(s) visited during #CrossBorderRail project:

Core Data

Track gauge: -
[Check this on OpenRailwayMap]

Max speed: -km/h
[Check this on OpenRailwayMap]

Number of tracks: -
[Check this on OpenRailwayMap]

Electrification: -
[Check this on OpenRailwayMap]

Train control system:
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region:

Importance to countries concerned:

Importance to TEN-T network:

TEN-T corridor:

European Commission Administrative Data

Infrastructure manager:

Language of operation:

Competent authorities for PSO passenger services:

Railway undertaking(s):

Ministry of transport:

European Commission Historical Data

Inauguration: 1911

Closure: 1931 (closure 1925 and dismantled 1945)

Passenger services:

Length of cross border section:

Average speed of cross border section:

Daily passenger flow:

Background

Photos from Cieszyn Marklovice 🇵🇱 – Albrechtice u Českého Tesina 🇨🇿 (No idea what this was – industrial line?)

There are no photos of this border on Flickr from the #CrossBorderRail project. Please see the main description above.