Border geo-coordinates: 49.551834, 5.825032 [Open on OpenStreetMap, OpenRailwayMap]

Status: Operational

#CrossBorderRail assessment: Active passenger line - visited by 🚆

Date(s) visited during #CrossBorderRail project: 01/07/2022

Core Data

Track gauge: 1435 mm
[Check this on OpenRailwayMap]

Max speed: km/h
[Check this on OpenRailwayMap]

Number of tracks: 1
[Check this on OpenRailwayMap]

Electrification: 25kV/50Hz~
[Check this on OpenRailwayMap]

Train control system: Crocodile, ETCS-L1
[Check this on OpenRailwayMap]

European Commission Political Assessment

Importance to border region: High

Importance to countries concerned: Low

Importance to TEN-T network: Low

TEN-T corridor: North Sea - Mediterranean

European Commission Administrative Data

Infrastructure manager: Infrabel [BE]; CFL [LU]

Language of operation: French/Luxembourgish

Competent authorities for PSO passenger services: FOD Mobiliteit en Vervoer [BE]; Département des Transports [LU]

Railway undertaking(s): SNCB [BE]; CFL [LU]

Ministry of transport: FOD Mobiliteit en vervoer [BE]; Ministère du Développement durable et des

European Commission Historical Data

Inauguration: 1874

Closure: -

Passenger services: 546 / 0 / 0 / -

Length of cross border section: 3 km

Average speed of cross border section: 75 km/h

Daily passenger flow: Not available

Background